HIGH TUNNEL PROJECT

Construction and Preparation Pictures 1-10   11-20   21-30   31-40   41-50  51-60

Completed high tunnel just before soil preparation and planting.
Control panel (thermostat with adjustable settings and manual overrides) for the motorized sidewalls.
After fertilizer was added to the soil, it was tilled.
Bed maker used to install the plastic mulch and the drip tape.
The bed maker was used to prepare the bed before the plastic mulch was installed.
Four beds were made inside each 17-feet wide high tunnel.
Before installing the plastic mulch, a herbicide was applied.
Plastic mulch and drip tape were installed with the bed maker.
Holes were punched through the plastic mulch at a spacing of 18 inches.
The holes were filled with water.

Go back to pictures 31 - 40

Continue with pictures 51 - 60

Back to High Tunnel Project