HIGH TUNNEL PROJECT Construction and Preparation Pictures 1-10 11-20 21-30 31-40 41-50 51-60 |
|
![]() |
Completed high tunnel just before soil preparation and planting. |
![]() |
Control panel (thermostat with adjustable settings and manual overrides) for the motorized sidewalls. |
![]() |
After fertilizer was added to the soil, it was tilled. |
![]() |
Bed maker used to install the plastic mulch and the drip tape. |
![]() |
The bed maker was used to prepare the bed before the plastic mulch was installed. |
![]() |
Four beds were made inside each 17-feet wide high tunnel. |
![]() |
Before installing the plastic mulch, a herbicide was applied. |
![]() |
Plastic mulch and drip tape were installed with the bed maker. |
![]() |
Holes were punched through the plastic mulch at a spacing of 18 inches. |
![]() |
The holes were filled with water. |