HIGH TUNNEL PROJECT Construction and Preparation Pictures 1-10 11-20 21-30 31-40 41-50 51-60 |
|
Completed high tunnel just before soil preparation and planting. | |
Control panel (thermostat with adjustable settings and manual overrides) for the motorized sidewalls. | |
After fertilizer was added to the soil, it was tilled. | |
Bed maker used to install the plastic mulch and the drip tape. | |
The bed maker was used to prepare the bed before the plastic mulch was installed. | |
Four beds were made inside each 17-feet wide high tunnel. | |
Before installing the plastic mulch, a herbicide was applied. | |
Plastic mulch and drip tape were installed with the bed maker. | |
Holes were punched through the plastic mulch at a spacing of 18 inches. | |
The holes were filled with water. | |