| HIGH TUNNEL PROJECT 
 Construction and Preparation Pictures 1-10 11-20 21-30 31-40 41-50 51-60 | |
|  | Finished framing of one of the end walls. | 
|  | Trenching of water and electricity to one of the high tunnels. | 
|  | Trenching of water and electricity to one of the high tunnels. | 
|  | Installing the first manual roll-up side. | 
|  | Installing the first manual roll-up side. | 
|  | Installing the first manual roll-up side. | 
|  | Installing the rope webbing on a manual roll-up side. The webbing will keep the roll-up side in place during high wind conditions. | 
|  | Close-up of a high tunnel outfitted with manual roll-up sides. | 
|  | One of the high tunnels being readied for installation of motorized roll-up sidewalls. | 
|  | Nearly completed installation of a motorized sidewall. |