HIGH TUNNEL PROJECT Construction and Preparation Pictures 1-10 11-20 21-30 31-40 41-50 51-60 |
|
![]() |
Finished framing of one of the end walls. |
![]() |
Trenching of water and electricity to one of the high tunnels. |
![]() |
Trenching of water and electricity to one of the high tunnels. |
![]() |
Installing the first manual roll-up side. |
![]() |
Installing the first manual roll-up side. |
![]() |
Installing the first manual roll-up side. |
![]() |
Installing the rope webbing on a manual roll-up side. The webbing will keep the roll-up side in place during high wind conditions. |
![]() |
Close-up of a high tunnel outfitted with manual roll-up sides. |
![]() |
One of the high tunnels being readied for installation of motorized roll-up sidewalls. |
![]() |
Nearly completed installation of a motorized sidewall. |