HIGH TUNNEL PROJECT

Construction and Preparation Pictures 1-10   11-20   21-30   31-40   41-50 51-60

Finished framing of one of the end walls.
Trenching of water and electricity to one of the high tunnels.
Trenching of water and electricity to one of the high tunnels.
Installing the first manual roll-up side.
Installing the first manual roll-up side.
Installing the first manual roll-up side.
Installing the rope webbing on a manual roll-up side. The webbing will keep the roll-up side in place during high wind conditions.
Close-up of a high tunnel outfitted with manual roll-up sides.
One of the high tunnels being readied for installation of motorized roll-up sidewalls.
Nearly completed installation of a motorized sidewall.

Go back to pictures 11 - 20

Continue with pictures 31 - 40

Back to High Tunnel Project